On July 8th, 2022, Vietranstimex (VTT) successfully transported the Vessel NP936 weighing 1740 ton from the fabrication location to the load-out position at VARD Shipyard Yard, Vung Tau.
All preparations began on August 1, and the site move to the load-out position at the jetty completed on August 8.
Equipment mobilised: a convoy of self-propelled hydraulic trailers SPMT (Self-propelled Modular Transporter) with 96 axles and 6 heads of PPU Commetto.